All articlesInstallation Guide

Hardwood Floor Installation: The Complete Homeowner's Guide

10 min read

A great hardwood installation depends on three things most cheap installers skip: moisture testing, acclimation, and subfloor prep. Get those right and your floor lasts 100 years. Get them wrong and it cups, gaps or squeaks within 12 months.

Choosing the format

Solid ¾" nail-down for plywood subfloors above grade. Engineered click-lock or glue-down for slabs, basements and radiant-heat applications. Wide plank (5"+) needs glue-assist even over plywood.

Acclimation

Hardwood must sit in the space at final humidity for 3–7 days before installation. Skipping this is the #1 cause of gapping and cupping in new floors.

Subfloor prep

Moisture test (below 12% for wood subfloor, below 4 lbs/CaCl for concrete). Level to 3/16" in 10 ft. Fasten loose panels. Add vapor barrier where needed.

Sand and finish (unfinished only)

If installing unfinished hardwood, sanding and finishing follows install. Prefinished skips this step but has small microbevels between boards.

Quick answers

How long does hardwood installation take?
A 1,000 sq ft installation takes 3–5 days, plus 3–7 days of acclimation before and 24–72 hours of finish curing after (unfinished floors).
Solid or engineered?
Solid for main levels on plywood subfloor. Engineered for basements, slabs and radiant heat.
Can you install over tile?
Rarely recommended. We usually remove the tile and prep the subfloor properly.

Keep reading